How long does a bathroom renovation in Sydney take?

If you're planning a bathroom renovation in Sydney, one of the most common questions is: how long does a bathroom renovation take? Whether you're updating a small ensuite or managing a full bathroom remodel, understanding the timeline helps you plan around the disruption, budget effectively, and avoid delays. At Kastell, we believe transparency is key — so we’re breaking down the bathroom renovation timeline, what factors affect it, and how to keep your project moving smoothly.

By
Cameron Gerardis
April 16, 2025
5 minutes
Modern Sydney bathroom with floating vanity, stone finishes, and sleek renovation design

Understanding the Typical Bathroom Renovation Timeline

For a full bathroom renovation in Sydney, the average timeline is 3 to 6 weeks. However, this can vary depending on the project size, material availability, and the scope of work involved.

Factors that impact your bathroom renovation duration:

  • Bathroom size & layout – Small bathrooms can move faster, but complex layouts take time
  • Scope of renovation – A cosmetic refresh is quicker than a full strip-out and rebuild
  • Material selection – Lead times for tiles, tapware, or custom vanities can affect scheduling
  • Trade availability in Sydney – Skilled trades are in high demand across the Lower North Shore and beyond
  • Approvals & compliance – Strata approvals can delay start dates

If you're planning a bathroom renovation in areas like Naremburn, Lane Cove, or Mosman, expect scheduling to vary depending on local access and contractor demand.

Step-by-step breakdown of a bathroom renovation timeline

Pre-renovation phase (1–4 Weeks)

  • Design meetings and layout planning
  • Site inspections and condition assessments
  • Itemised quotes and contract approvals
  • Material selections 
  • Ordering materials (e.g. tiles, vanities, frameless shower screens)
  • Scheduling licensed trades and confirming access

Demolition & structural work (Approx. 1 Week)

  • Safe removal of floor tiles, wall linings, fixtures, and cabinetry
  • Identifying and fixing underlying issues such as water damage or mould
  • Disposal and clean-up of all waste material

Plumbing, electrical & waterproofing (1–2 Weeks)

  • Plumbing rough-in: Drainage and pipe positioning
  • Electrical rough-in: Lighting, GPOs, exhaust fans, heated towel rails
  • Certified waterproofing application and drying time (typically 24–48 hours between coats)
  • Drying times can vary based on Sydney’s humidity and temperature conditions

Tiling & flooring (1–2 Weeks)

  • Laying floor tiles and bathroom wall tiles with required curing time
  • Intricate tile patterns or full-height walls can extend this stage
  • Grouting, sealing, and waterproofing final checks

Installation of fixtures & fittings (Approx. 1 Week)

  • Wall-hung vanity, toilet, mirrors, tapware, shower screens, accessories
  • Final electrical and plumbing connections
  • Styling, clean-up and final quality inspection

Want to know what each step involves in more detail? See our renovation process.

How long does a small bathroom renovation take?

Small bathroom renovations — including powder rooms or compact ensuites — often take 2 to 4 weeks, assuming good site access and no major structural changes.

Factors that can speed up a small bathroom reno:

  • Keeping the existing plumbing layout
  • Using pre-selected, in-stock fixtures and finishes
  • Hiring a builder like Kastell who handles all trades and scheduling in-house

Explore more small bathroom renovation ideas to help maximise your space without blowing the timeline.

Common delays and how to avoid them

Even well-planned renovations can run into issues. Here are common bathroom renovation delays and how we help you avoid them:

  • Material delays – We help you select products with reliable lead times and back-up options
  • Strata approvals – Our Pre-Project Planning process helps identify approval needs early
  • Unforeseen repairs – We conduct thorough site checks to reduce the risk of surprises
  • Trade availability – Kastell schedules all licensed trades in advance to keep your project moving

Trying to DIY waterproofing or tiling can also cause delays or compliance issues. Learn why hiring a licensed builder matters.

Tips for a faster, smoother bathroom renovation

Want to avoid downtime or decision fatigue? Here’s what we recommend:

  • Choose finishes early – Order tiles, vanities, and fixtures before demolition begins
  • Stick to the layout – Moving plumbing means extra time and approvals
  • Use experienced trades – Quality workmanship means fewer call-backs and delays
  • Work with a systemised builder – Kastell manages timelines and trade sequencing with precision

For more help with timelines and budgeting, explore our Budgeting & Timelines guide.

Get a realistic timeline for your Sydney bathroom renovation

The best way to get an accurate timeframe is with a site-specific renovation plan. Kastell provides fixed timelines and full project visibility — so you’re never left guessing when the job will be done.

Book a consultation to get started.

Thinking about renovating your bathroom?

Contact Kastell today for expert advice, transparent timelines, and high-quality craftsmanship. Whether you're a family renovator, downsizer, or rental investor, we’ll help you plan a bathroom renovation that runs on time and delivers lasting value.

Related Reading:

External Resources:

Disclaimer: The content in our blogs are for informational purposes only and do not constitute legal advice. Always consult a qualified professional for guidance tailored to your specific situation.